April 1 Lincoln Teddy Bear Club Day Care
Installation of an addition along with Parking lot, drainage, water, septic and drainiage
cache/wst.opf.3963946.xml
Aug 2012 Chelmsford
Condo Post Office was hit by delivery truck and had to be removed saving the foundation
cache/wst.opf.3139429.xml
August 2012 Devens concrete culvert Replacement
Replace a Metal pipe culvert with a concrete culvert and hav erd open in 30 days for school.
cache/wst.opf.3139389.xml
July 2012 Bellingham 60'x40' steel building addition
Owner needed to expand shop from an existing 60'x40' building to a 60' x 80' steel building while staying open.
cache/wst.opf.3139307.xml
July 2012 Westborough  concrete Wall removal
Owner had concrete Wall That had to be removed to make room for sunroom
cache/wst.opf.2803377.xml
June 2012 Natick Ma Pool removal
Gunite pool was not being used and became a liability
                      
cache/wst.opf.2803364.xml
April 2012 Mendon Ma Stamped Patio
Owner wanted extra outdoor space for entertaining.

                             
March 2012    Milford Ma Septic System

This septic system is a bed system using 4" pvc pipe and 1-1/2 washed stone
  
  
                      

Febuary 2012 Upton Ma Septic System

Remove trees and install a new tank and bed septic field for a failed system.


                         
January 2012 Upton Ma Culvert replacement

Remove existing 18" cmp pipe and replace it withe a 24" hdpe pipe and install rip rap for erosion control.

                        

June 2011 Worcester State College Pedestrian Bridge

This job Consisted of removing an old wooden bridge and replacing it with a new precast bridge with decorative railing.

                             
                             
                                                  

2010 North Attleboro Ma Camron Woods

This project was a small 9 lot subdivision with a underground detention basin.
   
                            
   
                                                                               

January 2010 Pittsfield Ma Temporary Bridge

This Job was placing a Accrow Temporary bridge over a collapsed culvert for temporary access. The job had to be completed on time and had to be worked on through the winter.  
     
                                 
                                 
                                                     

June 2010 Monson MA Bridge repair

Remove all stone and debris from river bottom and replace it withe new stone, rebuild stone walls and crack seal existing abutments.

                           

                                                      

September  2010 Upton MA Retaining Wall

Build a 80 lf wall 3' high to hold back a existing septic field to allow for a walkway along side a barn.

                           

                                                    